Pages

Friday, April 5, 2019

Bridge Challenge

This week students were challenged to build a suspension bridge that can span a bucket and hold at least 10 grams. All the bridges were successful. Students then worked at strengthening their designs to hold heavier loads. 



No comments:

Post a Comment